.png)
The purpose of the external evaluation is to:
The evaluation will focus on the following five OECD-DAC criteria:
1. Relevance
2. Effectiveness
3. Efficiency
4. Impact
5. Sustainability
Scope of Work
The evaluation will cover the entire implementation period (July–December 2025) and all project components, including:
It will assess both qualitative and quantitative dimensions, focusing on the project’s outcomes and alignment with TDA’s theory of change and ZIVIK’s peacebuilding objectives.
Methodology
The evaluator will propose a detailed methodology consistent with international evaluation standards. It should include, at a minimum:
Gender, inclusion, and conflict sensitivity must be mainstreamed throughout all evaluation activities.
Deliverables and Timeline:
1. Inception Report: Detailed methodology, evaluation matrix, work plan, and data collection tools for zivik’s review and approval. Due on December 1st 2025
2. Data Collection Phase : Field visits, interviews, focus group discussions, and desk review of project documentation. Due between December 2nd - 15th , 2025
3. Draft Evaluation Report : Preliminary findings, analysis, and recommendations submitted to TDA and zivik for comments. Due on : December 17th 2025
4. Validation Meeting : Presentation of main findings and discussion of feedback with TDA and zivik. Due on : December 20th 2025.
5. Final Evaluation Report : Revised final report incorporating comments, submitted in English (max. 20 pages, excluding annexes). Due on : December 24th 2025
The final report shall include an evaluation summary (2 pages) in English, with recommendations clearly linked to each evaluation criterion.
Roles and Responsibilities
Evaluator(s):
TDA:
ZIVIK / IFA:
The external evaluator (or team) should possess:
9. Ethical Considerations
The evaluation must adhere to the principles of independence, impartiality, informed consent, confidentiality, and “do no harm”.
All data collected must remain confidential and be used exclusively for evaluation purposes.
Reporting and Submission
All deliverables shall be submitted electronically in English to TDA and ZIVIK.
The evaluation report must include:
Budget and Payment Terms
Payment will be made in two instalments:
ننصح بقراءة طريقة التقديم بعناية و التقيد بتعليمات التقدم للوظائف و المناقصات.